Hore
References from 2012
- Implementation of selected operational files and building constructions of the ”Bratislava West Cogeneration Source”
- RECONSTRUCTION OF PK4 STEAM BOILER – design and installation of electrical parts for high voltage at Tepláreň Košice, a.s.
- Reconstruction of JAVYS (AKOBOJE) physical protection system – processing of project documentation
- Bzovík I and Bzovík II Biogas Plants – power outlet
- Dvorianky Biogas Station – power outlet
- Bešeňová Cogeneration – power outlet
- Inspection and maintenance of the T1 and T2 transformers at Tepláreň západ (TpZ)
- Operation and maintenance of photovoltaic plants